SD Worx
Rising along the Scheldt, the future headquarters of SD Worx will feature a bold exoskeleton and lush green terraces overlooking the city.
Built in concrete and timber, the building will host offices for 650 employees, as well as coworking areas, an auditorium, a cafeteria, and shared spaces. Scheduled for completion in summer 2028, it is set to become a new architectural icon on Antwerp’s skyline.
| Surface | 24.300 m² |
| Key innovations | Hybrid low-carbon structure, smart workplace systems |
| CO₂ stored | 1.596 T (estimated) |
| Partners | VAN LAERE, VMA |
| Certifications | Expected: BREEAM Outstanding |
| Energy performance | Targeting 40% below NZEB threshold |
| Fossil-fuel free operation | Yes – all-electric systems planned |
| M³ wood | 1011m³ of glulam and 975m³ of CLT |
| Architect | Sergison Bates Architects and BULK |
| Year of completion | 2028 (planned) |